AQWA-LINE CONCEPT
Construct Freshwater Arteries, North-South, to alleviate drought.

AIMS/GUIDELINES
AQWA-LINES, (eg. Ord River to Perth. Proposed Route via Derby, Broome, Karratha, DBNGP
Elevate to ease alignment, installation, flooding issues.
Minimise ground-level footprint, (consideration for fauna/flora)
Allow for Future expansion and offtakes

Incorporate;-
Transverse road/rail crossings
Solar Power
Carriages for personnel/maintenance.

PROS
Freshwater supply (Perth and adjacent AQWALINE areas)
National long-term benefits.
Local design, materials, fabrication and construction.
Potential for tourism.

CONS
Distance.
COST